Current Road ProjectsOther - Watauga County

Bethel Road/Bridge Update

Last Updated on August 7, 2012 6:25 pm

*UPDATE AUG 7,2012* According to NCDOT Resident Engineer Doug Eller, Aug 10 is still the last scheduled day of closure. Any remaining work will be able to be done under temporary lane closures.
——————————————-
N.C. Department of Transportation will begin a bridge preservation project on Bethel Road (State Road 1202) west of Boone in Sugar Grove at 7 a.m. Saturday, May 26, weather permitting.

The project is scheduled to be completed by August 10. During that time, Bethel Road will be closed and a detour route has been set up. Northbound traffic on Bethel Road will take U.S. 321 to Guy Ford Road (S.R. 1200) to Peoria Road (S.R. 1201) to Bethel Road. Southbound traffic will reverse directions.

[mappress mapid=”58″]

Taylor & Murphy Construction Company of Asheville was awarded the contract to perform the work. This involves concrete overlay, deck replacement, cleaning and painting structural steel and bearings, as well as substructure repairs on the bridge over the Watauga River.

NCDOT reminds motorists to watch signs for construction information, stay alert and obey the posted speed limit.

For real-time travel information at any time, call 511, visit www.ncdot.gov/travel or follow NCDOT on Twitter at www.ncdot.gov/travel/twitter. Another option is NCDOT Mobile, a phone-friendly version of the NCDOT website. To access it, type “m.ncdot.gov” into the browser of your smartphone. Then, bookmark it to save for future reference. NCDOT Mobile is compatible with the iPhone, Android and some newer Blackberry phones.

For more information, please contact Resident Engineer Doug Eller at (828) 265-5088.

Back to top button